Civil Rights
Movements, leaders, victories and the continuing fight for equality.
Explore the people, places, events, achievements, struggles and stories that shaped our journey.
Movements, leaders, victories and the continuing fight for equality.
Innovation, patents, science, technology and world-changing contributions.
Pioneers, champions, Negro Leagues, records, activism and excellence.
Meet the people whose lives, choices and achievements shaped the journey.
Black towns, communities, institutions and places where history happened.
Moments that changed communities, movements, institutions and the nation.
In 1968 Shirley Chisholm became the first Black woman elected to the United States Congress. In 1972 she launched a campaign for the Democratic presidential nomination, breaking another political barrier.
MORE →Reflects the personal views, recollections, and perspective of the author, Mike Davis.
This is a personal recollection on the Move fire on May 13, 1985
Render of the Spectrum rocket taking off from the launchpad | |
| Function | Orbital launch vehicle |
|---|---|
| Manufacturer | Isar Aerospace |
| Country of origin | Germany |
| Size | |
| Height | 28 m (92 ft) |
| Diameter | 2 m (6 ft 7 in) |
| Stages | 2 |
| Capacity | |
| Payload to LEO | |
| Mass | 1,000 kg (2,200 lb) |
| Payload to SSO | |
| Mass | 700 kg (1,500 lb) |
| Launch history | |
| Status | Operational |
| Launch sites |
|
| Total launches | 2 |
| Success(es) | 1 |
| Failure | 1 |
| First flight | 30 March 2025 |
| Last flight | 5 September 2026 |
| First stage | |
| Powered by | 9 x Aquila |
| Propellant | Propane/LOX |
| Second stage | |
| Powered by | 1 x Aquila |
| Propellant | Propane/LOX |
| Country of origin | Germany |
|---|---|
| Designer | Isar Aerospace |
| Manufacturer | Isar Aerospace |
| Application |
|
| Status | Operational |
| Liquid-fuel engine | |
| Propellant | LOX / Propane |
| Cycle | Gas-generator cycle |
| Performance | |
| Thrust, sea-level | 75 kN (17,000 lbf) |
| Used in | |
| Spectrum | |
Spectrum is a two-stage orbital small-lift launch vehicle built by German company Isar Aerospace.[1] Development of the Spectrum commenced during the 2010s. Much of its design has been produced internally. A key target during development was the price point of €10,000 ($11,700) per kg, as well as to be as flexible as possible as to suit a wide variety of payload requirements. Isar Aerospace has arranged to launch Spectrum from both the Andøya Spaceport in Norway and the Guiana Space Centre in French Guiana. Early customers for the launcher include Airbus Defence and Space, the German Aerospace Center (DLR), and Spaceflight, Inc.
Spectrum is the first rocket developed/built in Germany to reach orbit,[2] the first orbital rocket to launch successfully from Western Europe (European rockets had previously only launched from the Kourou spaceport, Russia has launched satellites from the Plesetsk Cosmodrome)[3][4], and the first privately developed launch vehicle from Europe.[5][6] Previously, three rockets developed in Germany had crossed the Kármán line (the V-2 in 1944; a rocket by the Berthold-Seliger research and development company in 1963; and the Mapheus sounding rocket in 2009[7]).
Spectrum is a two-stage launch vehicle designed to carry both small- and medium-sized satellites.[1] It has a maximum payload capacity of 1,000 kg (2,200 lb) to low Earth orbit (LEO) or alternatively up to 700 kg (1,500 lb) to a Sun-synchronous orbit (SSO). Isar Aerospace has promoted the launcher as possessing considerable flexibility, better allowing it to fulfill the varying demands of its prospective customers.[1] According to the company, the vast majority of Spectrum's development and manufacturing is in-house, including that of its Aquila engines. It is a relatively compact rocket, in part facilitated by the high energy density of its propellant, which comprises a combination of liquid oxygen and propane.[1] It has been designed to achieve a price point of €10,000 ($11,700) per kg.[8]
The first stage of Spectrum is powered by an arrangement of nine Aquila engines, while the second stage uses a single Aquila engine.[1] This second stage engine is to be equipped with a multi-ignition system, permitting it to be shut down and reignited if the launch profile should require such an arrangement, eliminating the need for an additional kick stage.[9] The propellant is supplied to the engines at high pressure via a turbopump.[1] In March 2023, Isar Aerospace reported having performed 124 hotfires of the Aquila engine during the prior year, these test runs having been performed at Esrange, Sweden;[10] these tests demonstrated greater than anticipated performance with one of these engines being fired on six separate occasions without any intervening refurbishment.[11]
The rocket's structure is made of a single-part carbon composite and is manufactured with an automated process. This lightweight material offers the highest payload performance.[12]

In April 2021, a 20-year deal was signed by Isar Aerospace for exclusive access to one of the Andøya Space launch pads in Norway. Due to its location, inclinations between 87.4 and 108 degrees can be reached from this launch site, targeting Sun-synchronous and polar orbits.[13][14]
In July 2022, Isar Aerospace announced that it had been selected by France's National Centre for Space Studies (CNES) to conduct launch operations at the former Kourou Diamant Launch Site at the Guiana Space Centre, which had been last used for an orbital launch in 1975. The low latitude of this launch site allows it to be used for equatorial and medium inclination orbits. The first launch to take place from this launch site had been scheduled for 2024.[15] By 2025, however, Isar delayed the "start of operations" at Kourou to 2027 at the earliest.[16]
On 7 July 2026, Isar signed a deal with Maritime Launch Services (MLS) to develop a purpose built Spectrum launch site at Spaceport Nova Scotia (SNS).[17] The plans for the launch pad where expected 1 September, the handover of the pad to Isar on 1 November 2026, with the pad to be operational on 31 December 2027.[17] The US$3.75 million quarterly lease will last for a 10-year term with two optional additional 5-year terms.[17]
On 1 September it was announced that Isar and MLS could not agree on a finalized design and extended the deadline to do so to 15 September.[18] Following the 2nd launch of Spectrum on 5 September, Isar reiterated that they are targeting launches at SNS in 2028 as their first outside Norway.[19] On 14 September Isar and MLS announced that they had finalized the statement of work and programmatic milestones for the launch site, and had begun building infrastructure towards the pad location.[20] On 15 September American Small-Sat ride-share provider SEOPS announced that they had purchased 5 spectrum launches in 2028 for their Waymaker missions, with an unspecified number of these launches to be at SNS.[21]
In 2021, multiple launch arrangements using Spectrum were announced by companies such as Airbus Defence and Space,[22][23] EnduroSat,[24] and Astrocast.[25] In December 2021, Isar Aerospace and the German Aerospace Center (DLR) announced that a total of seven small satellites would comprise the institutional payload to be carried on Spectrum's first flight.[26] In early 2023, Spectrum's first American customer, Spaceflight, Inc., agreed to terms for a dedicated launch from Andøya during 2026 along with an option for a 2025 launch.[27][28]
In December 2021, the first launch of Spectrum was anticipated to take place sometime in 2022.[26] By March 2023, Isar Aerospace was reportedly aiming for the first flight to occur sometime during the second half of 2023.[29][30] However, by November 2023, this milestone was postponed again to 2024.[31] Plans to launch the first rocket in 2024 were delayed until an exhaustive slate of tests could be performed.[32]
On 21 February 2025, a static fire test of Spectrum was performed that reportedly confirmed that the rocket was ready.[32] One month later, a launch license was issued by the Norwegian Civil Aviation Authority (NCAA).[33] Shortly thereafter Isar Aerospace announced that they were in the process of assembling the second and third Spectrum.[32][34] The first launch attempt on 24 March 2025 was scrubbed due to high winds.[35]
On 30 March 2025 at 12:30 pm local time, the rocket was launched from Norway for the first time; however, it lost control several seconds later, causing it to fall into the sea and explode.[36] An investigation found that the rocket's vent valve had opened unexpectedly, leading to a loss of attitude control at the start of the roll maneuver.[37] The rocket did not carry a payload.[38]
A second launch on 5 September 2026 was successful, deploying several small satellites into a Sun-synchronous orbit.[19] The flight carried 5 academic cubesats and 1 undeployable payload to qualify Spectrum for future commercial satellite launches.[19]
| Flight No. | Date and time (UTC) |
Launch site | Payload | Orbit | Launch outcome |
|---|---|---|---|---|---|
| 1 | 30 March 2025, 11:30 | Andøya Spaceport, Norway | None | Failure | Failure |
| Maiden/demonstration flight of Spectrum, 'Going Full Spectrum'. 18 seconds into flight, control of the vehicle was lost. | |||||
| Flight No. | Date and time (UTC) |
Launch site | Payload | Orbit | Launch outcome |
|---|---|---|---|---|---|
| 2 | 5 September 2026, 20:12 | Andøya Spaceport, Norway | 500 km, SSO | Success | |
| Second test flight, "Onward and Upward". This launch carried five CubeSats and one non-separable experiment as part of the European Space Agency (ESA)'s "Boost!" program: CyBEEsat (TU Berlin); TriSat-S (University of Maribor); Platform 6 (EnduroSat); FramSat-1 (NTNU); SpaceTeamSat1 (TU Wien Space Team); Let It Go (Dcubed, non-separable experiment).[39] A 25 March launch attempt was aborted by check system, and the 9 April launch was scrubbed due to a leak. Another launch attempt in on 15 June was aborted due to issues in the fluid system.[40] First German rocket to reach orbit. First night launch of Spectrum.[41] | |||||
| Flight No. | Date and time (UTC) |
Launch site | Payload | Planned orbit | Customer |
|---|---|---|---|---|---|
| 3 | NET 2026[42][43][44] | Andøya Spaceport, Norway | TBA | R-Space | |
| First commercial launch. Dedicated launch for R-Space; the first Austrian commercial satellite. Two experiments are developed by the Austrian companies ENPULSION and SunBooster while another is developed by the Portuguese company Synopsis Planet.[43] | |||||
| TBA | NET 2026[45] | Andøya Spaceport, Norway | TBA | Planet Labs Germany | |
| A Pelican-type Earth observation satellite built by the Berlin-based German subsidiary of Planet Labs for the German government.[46][47] | |||||
| TBA | NET 2026[48] | Andøya Spaceport, Norway | LEO | ESA | |
| ΣYNDEO-3, built by Redwire Corporation for ESA and EU, will carry 10 different technological demonstration payloads provided by organizations from Spain, France, Germany, Italy, Luxembourg, and the European Commission. | |||||
| TBA | NET 2026[49] | Andøya Spaceport, Norway | TBA | ESA | |
| The Cassini mission, led by ESA and funded by EU, will carry three 6UXL CubeSats with each satellite hosting multiple experiments from different European organizations.[49][50] | |||||
| Flight No. | Date and time (UTC) |
Launch site | Payload | Planned orbit | Customer |
|---|---|---|---|---|---|
| TBA | NET 2027[51] | Andøya Spaceport, Norway | TBA | ElevationSpace | |
| Dedicated launch for ElevationSpace. | |||||
| TBA | NET 2027[52] | Andøya Spaceport, Norway | TBA | Astroscale | |
| Dedicated launch for Astroscale. ADRAS-J2 is a space debris removal mission developed for JAXA.[53] | |||||
| TBA | NET Q2 2027[54][55] | Andøya Spaceport, Norway | TBA | ESA | |
| Tom & Jerry, led by ESA and funded by EU, will consist of two satellites to demonstrate a space debris cleanup mission.[56][57] | |||||
| Flight No. | Date and time (UTC) |
Launch site | Payload | Planned orbit | Customer |
|---|---|---|---|---|---|
| TBA | NET 2028[58] | Andøya Spaceport, Norway | SSO | NOSA | |
| Two satellites to be launched for the Norwegian Space Agency's Arctic Ocean Surveillance program. AOS-D will demonstrate maritime monitoring technologies and AOS-D will be the first operational satellite in a system to track maritime activities in the Arctic.[59] | |||||
| TBA | NET 2028[60] | Andøya Spaceport, Norway | LEO | SEOPS | |
| Dedicated multi-customer payload ride-share launch managed by SEOPS. | |||||
| TBA | NET 2028[61] | Andøya Spaceport, Norway | TBA | Astroscale UK | |
| Dedicated launch for Astroscale.[62] ELSA-M is a space debris-removal vehicle developed for Eutelsat, ESA, and UKSA.[63][64][65] | |||||
| TBA | NET 2028[66][67][68] | TBA[a] | TBA | SEOPS | |
| Dedicated multi-customer payload ride-share launch managed by SEOPS. | |||||
| TBA | NET 2028[66][67][68] | TBA[a] | TBA | SEOPS | |
| Dedicated multi-customer payload ride-share launch managed by SEOPS. | |||||
| TBA | NET 2028[66][67][68] | TBA[a] | TBA | SEOPS | |
| Dedicated multi-customer payload ride-share launch managed by SEOPS. | |||||
| TBA | NET 2028[66][67][68] | TBA[a] | TBA | SEOPS | |
| Dedicated multi-customer payload ride-share launch managed by SEOPS. | |||||
| TBA | NET 2028[66][67][68] | TBA[a] | TBA | SEOPS | |
| Dedicated multi-customer payload ride-share launch managed by SEOPS. | |||||
Source: Wikipedia. Article content is retrieved live through the MediaWiki API.
Spectrum is a two-stage orbital small-lift launch vehicle built by German company Isar Aerospace. Development of the Spectrum commenced during the 2010s. Much of its design has been produced internally. A key target during development was the price point of €10,000 ($11,700) per kg, as well as to be as flexible as possible as to suit a wide variety of payload requirements. Isar Aerospace has arranged to launch Spectrum from both the Andøya Spaceport in Norway and the Guiana Space Centre in French Guiana. Early customers for the launcher include Airbus Defence and Space, the German Aerospace Center (DLR), and Spaceflight, Inc. Spectrum is the first rocket developed/built in Germany to reach orbit, the first orbital rocket to launch successfully from Western Europe (European rockets had previously only launched from the Kourou spaceport, Russia has launched satellites from the Plesetsk Cosmodrome), and the first privately developed launch vehicle from Europe. Previously, three rockets developed in Germany had crossed the Kármán line (the V-2 in 1944; a rocket by the Berthold-Seliger research and development company in 1963; and the Mapheus sounding rocket in 2009).
NASASpaceflight, often referred to as NSF, is a private aerospace news organization, which operates a YouTube channel, website, a shop and a forum, which launched in 2005, as well as various social media channels covering crewed and uncrewed spaceflight and aerospace engineering news. NASASpaceflight original reporting has been referenced by various news outlets on spaceflight-specific news, such as MS NOW, USA Today and The New York Times, among others. NASASpaceflight also produces videos and live streams of rocket launches online, with a special focus on developments at SpaceX's Starbase facility, for which they were recognized with an award by SpaceNews. NSF provides livestream production services to Firefly Aerospace for launches of their Alpha rocket and to Isar Aerospace for launches of their Spectrum rocket. NSF is also currently providing three 24/7 live-streams covering the following: The Starship operations at Starbase in Texas; The testing of the Raptor, Merlin, and SuperDraco engines near McGregor, Texas; Various live videos from Cape Canaveral and Kennedy Space Center in Florida. NSF was founded by managing editor Chris Bergin, and is owned and operated by John "Das" Galloway. The NSF content is produced by a team of spaceflight reporters, journalists, contributors, editors, photographers, and videographers across the United States and other countries. NSF offers several tiers of paid membership through their YouTube channel, and either a recurring or lifetime "L2" membership on their website for exclusive photo galleries and access to certain sections of their forum. NSF also operates the Next Spaceflight website, which keeps track of spaceflight launches, launch pad locations, reusable vehicles, Starship hardware, and maintains a list of all orbital rockets. They also operate a mobile app for prelaunch notifications, launch timelines, and 3D flight simulations.
Andøya Space, formerly Andøya Space Center, is a rocket launch site, rocket range, and spaceport on Andøya island (the northernmost in the Vesterålen archipelago) in Andøy Municipality in Nordland county, Norway. Since 1962, over 1,200 sounding and sub-orbital rockets of various configurations have been launched from the site. In September 2026, the site hosted its first successful orbital launch, when Isar Aerospace launched its Spectrum rocket from Andøya Spaceport, making it first launch from Northern Europe, making it second active spaceport in Europe after Plesetsk Cosmodrome and third European spaceport in history after Kapustin Yar launch facility and Plesetsk Cosmodrome. Andøya Space is a civilian, limited liability company with its ownership split between two groups: 90% by the Royal Norwegian Ministry of Trade and Industry, and 10% by Kongsberg Defence Systems company. It operates on a commercial basis. Andøya Space also supports the SvalRak launch facility in Ny-Ålesund, Svalbard to the north. The facility has provided operations for both ESA, NASA, JAXA, and DLR missions and related scientific research.
FramSat-1 is a technology demonstration satellite developed by Orbit NTNU, a student team from the Norwegian University of Science and Technology, with the support of the Fly Your Satellite! programme of the European Space Agency (ESA). The 1U CubeSat-type small satellite was designed, apart from supporting education, to test an experimental sun sensor developed by Eidsvoll Electronics (EIDEL) for use in satellites and sounding rockets. FramSat-1 was launched from Andøya Spaceport to low Earth orbit on 5 September 2026 on the "Onward and Upward" flight of the Spectrum rocket, the first successful orbital launch from West European soil, thus also becoming the first Norwegian satellite launched from Norway. The launch of the satellite was supported by a microlauncher competition funded by ESA and DLR.
Before the 1921 destruction of Tulsa’s Greenwood District, Black residents had created a remarkable center of business and community life. The district included stores, professional offices, entertainment venues and homes owned by Black citizens. Understanding Greenwood means learning what was built—not only what was burned.
MORE →Brown v. Board of Education in 1954.